About Sea Max Fire Engineering Works
Sea Max Fire Engineering Works is a Delhi-based manufacturer and full-service fire protection contractor. For more than four decades we have designed, manufactured, installed and maintained fire safety systems and equipment across commercial, industrial, healthcare and critical-infrastructure facilities. Our work covers everything from certified fire extinguishers and emergency signage to fully integrated suppression systems and annual maintenance programs.
Our story — grounded in practical experience
Sea Max began with a simple, urgent idea: make dependable, compliant fire protection affordable and locally available. Since our modest start in 1980, we have steadily grown while keeping one thing constant — a focus on engineering that works in the real world.
Today our solutions are the result of on-site lessons learned over thousands of installations: the piping nodal layouts that simplify maintenance, the extinguisher models that tolerate harsh environments, the pre-commission checks that catch hidden leaks before clients take occupancy.
Our founder and mentor, Mr. Deepak Kumar Garg, has guided the company with hands-on industry experience and a continual emphasis on practical engineering. Under his leadership Sea Max has expanded its manufacturing capability and developed a large team of engineers, technicians and after-sales professionals.
We offer tailored solutions for:
Data centres and telecom rooms
Hospitals and healthcare facilities
Hotels and commercial buildings
Manufacturing plants and warehouses
Restaurants and commercial kitchens
Educational institutions and residential complexes
Consultation & Risk Assessment — On-site hazard scans, asset mapping and prioritised recommendations.
Design & Engineering — Drawings, hydraulic/agent calculations, GA layouts and BOQs.
Manufacture & Supply — In-house manufacturing of extinguishers and quality-controlled procurement of pumps, panels, valves and suppression agents.
Installation & Commissioning — Supervised installation, pressure tests, pump acceptance and full commissioning with signed certificates.
Training & Handover — O&M manuals, operational training and fire-drill facilitation for staff.
Maintenance & AMC — Monthly/quarterly service, emergency response and verified service reports.
Our product capabilities
Sea Max manufactures and supplies a broad product range, each backed by test reports and installation support:
Portable Fire Extinguishers — ABC, CO₂, Foam, Water, K-Guard, Clean Agent and Automatic units.
Fire Detection & Alarm — Addressable/conventional panels, smoke/heat detectors and manual call points.
Suppression Systems — Clean agent systems (HFC-style/inert alternatives), CO₂ systems, foam flooding and tube-based local-application systems.
Hydrants, Pumps & Sprinklers — Fire pumps, jockey pumps, hydrant networks, hose reels and sprinkler layout solutions.
Fire Doors & Emergency Lighting — Rated doors, escape signage and compliant emergency luminaires.
Each product group has a dedicated technical file, assembly checklist and spares list — available on request
We combine formal qualifications with field-tested know-how. Our core teams include:
Fire Safety Engineers — Designing suppression and detection systems with documented calculations and code references.
Project Managers — Delivering projects on schedule while coordinating with clients, architects and authorities.
Installation Technicians — Trained in pumping systems, piping practices and safe handling of suppression media.
QA/QC & R&D — Ensuring production quality, product testing and continuous improvement of system components.
After-Sales Response Team — AMC coordinators, field service engineers and refill technicians available 24×7.
Add real staff bios and photos here to increase trust: name, qualification, experience, and a short quote from each key person.
Our approach to quality is practical and verifiable. For every project we:
Use traceable material certificates and batch records.
Follow documented fabrication and pressure-testing procedures.
Prepare installation method statements, test protocols and commissioning acceptance forms.
Provide as-built drawings, O&M manuals and service history for audit and insurance purposes.
We design systems in line with applicable codes and best practices (Indian Standards, NBC and internationally accepted NFPA principles where required). Specific code references and applicable clauses are included in project design packs and O&M manuals.
Data Centre — Clean Agent Protection
Scope: 120 m² server room.
Solution: Redundant clean agent system with room integrity testing and double-release safety interlock.
Outcome: Minimal intervention during tests, verified agent concentration and compliant handover.
Manufacturing Plant — Foam & Hydrant System
Scope: Storage and transfer area for flammable liquids.
Solution: Foam proportioning skid, high-capacity pump house and hydrant ring-main.
Outcome: Full system acceptance test with documented flow rates; quick response readiness.
Hotel — Kitchen Protection & Alarm Integration
Scope: Multi-kitchen layout and guest areas.
Solution: Automatic kitchen suppression, hood detection and full fire alarm integration with building management.
We believe safety decisions must be transparent. With Sea Max you get:
Clear, itemised proposals and deliverables.
Documented QA/QC and commissioning evidence.
Post-handover support with traceable AMC reports.
Practical training for your staff — not just paperwork.
We aim to reduce operational risk, reduce downtime and ensure systems are ready when needed.
Q: Do you offer 24×7 service and extinguisher refilling?
A: Yes. We provide refilling, repair and emergency maintenance services with priority response for AMC customers.
Q: Can you work with my architect and statutory authorities?
A: Yes. We prepare drawings and documentation for approvals and coordinate with architects, consultants and local authority requirements.
Q: Do you provide warranties and spares?
A: Our products come with manufacturer warranties; project-specific spares lists and warranty terms are included in the proposal.